Every December, the same thing happens: an order goes in too late, the parcel lands in January, and the season has gone. Here are the dates that matter.
The three lead times that set the whole calendar
Nothing on this page is a guess. These are the numbers we quote every day, and they are the same numbers that decide whether your stock lands before Black Friday or after New Year.
- In-stock designs: dispatched within 24 hours, from one piece
- Sampling on a custom design: 5–7 days after you approve the drawing
- Production: 7–10 business days
- Air freight: 7–10 days to the US, UK and EU
Added up, a custom order runs about four weeks from drawing to doorstep. An in-stock order runs under two. That gap is the whole reason the dates below are different.

Holiday 2026 order-by dates
Two columns matter here. The first is the last date that still works on paper. The second is the date we recommend once you allow for customs and for the congestion every freight lane sees in December.
| What you are ordering | Needs to arrive before | Last date on paper | Recommended order-by |
|---|---|---|---|
| Custom OEM/ODM, 30+ pieces, air | Black Friday, 27 Nov | 31 Oct | 26 Oct |
| Custom OEM/ODM, 30+ pieces, air | Christmas, 25 Dec | 28 Nov | 23 Nov |
| In-stock designs, air | Black Friday, 27 Nov | 16 Nov | 11 Nov |
| In-stock designs, air | Christmas, 25 Dec | 14 Dec | 9 Dec |
| In-stock designs, air | New Year, 1 Jan | 21 Dec | 17 Dec |

What to have ready before you order
Most delays we see are not production delays. They are files that arrive after the order does. Have these ready and a quote turns around in one business day:
- A clear drawing, photo or reference for each design, with dimensions
- The stone size and total carat you want, per design
- Quantities per design and per size, not just a total
- Your logo file, if it goes on the piece or on the box
- Packaging choice: PE box, pouch, or your own printed box
- Delivery address and the Incoterm you are working on

If you miss the date
Missing a cut-off is not the end of the season. Three things usually work, in this order:
- Switch the styles that can switch. If part of the order exists as an in-stock design, ship that half now and produce the rest for January.
- Split the shipment. Send what is finished by air and hold the balance for sea freight, rather than holding everything back for one departure.
- Tell us the real date you need it. We will say plainly whether it is achievable. A date we cannot hit is worse for you than a date we can.
After the holidays: book Q1 before Chinese New Year
Chinese New Year falls on 6 February 2027. Production stops for the holiday, and the queue to restart is always longer than the queue in November. If you need stock in February or March, place the order in the first half of January. Buyers who wait until after the holiday are usually quoting against April delivery.
Locking a production slot
Send the design references and the quantities, and we will confirm the slot and the ship date in writing, with the cut-off date for your specific order printed on the quote. From one piece on stock designs, from 30 pieces on custom, with no mould cost from 30 pieces up.